Editors note: This post will start with our 1st pictures
of the bathrooms and will them progress through our
unpacking/remodeling pictures. Rather than wait until it's all done,
I've decided to give periodic progress reports.
There are 2 1/2 baths in this house. A full bath connected to the master; a 1/2 bath next to the laundry room; and a full bath upstairs. Several of the baths appear to have water damage either on the ceiling or on the floor. So far as we can tell, the leaks have been fixed, the damage was just never repaired.
January 2014: The downstairs 2nd bath is still not painted. We did change out the light fixture though. The kids bath upstairs is almost finished. We have touch up and fixtures to install.
There are 2 1/2 baths in this house. A full bath connected to the master; a 1/2 bath next to the laundry room; and a full bath upstairs. Several of the baths appear to have water damage either on the ceiling or on the floor. So far as we can tell, the leaks have been fixed, the damage was just never repaired.